27,950
edits
mNo edit summary |
|||
| Line 1: | Line 1: | ||
'''weezer rehearsals - extended info'''<br> | |||
<small>'''05/06/2000'''</small> | |||
Weezer rehersals... | |||
I came to LA about a week after the guys started rehersing, and sat in on almost all of them for the next 2 weeks. They were, and still are, rehersing every day, starting at 6 pm. The rehersals have been lasting anywhere from 1 - 3 hours, and are pretty intensive, with only a few short breaks. They are working at an undisclosed space in Hollywood, that was quite familiar to me, as theyve been there numerous times before. Rivers's new garage studio was shut down before construction was completed by the zoning inspector, (d'oh!), so there is no plans to start working there anytime soon. | I came to LA about a week after the guys started rehersing, and sat in on almost all of them for the next 2 weeks. They were, and still are, rehersing every day, starting at 6 pm. The rehersals have been lasting anywhere from 1 - 3 hours, and are pretty intensive, with only a few short breaks. They are working at an undisclosed space in Hollywood, that was quite familiar to me, as theyve been there numerous times before. Rivers's new garage studio was shut down before construction was completed by the zoning inspector, (d'oh!), so there is no plans to start working there anytime soon. | ||